Author: Friedrich Beckmann
Saw the beams to a length of 470mm
Use a brush 3 to put UHU POR in the beam opening of the fuselage
Use the same brush to paint one side of the beam with UHU POR
Wait for minimum 10 min to let the UHU POR get dry.
⇒ Next One with KLEIBERIT, difficult to bring the beam to the bottom