Fuselage Beams
Author: Friedrich Beckmann
- Saw the beams to a length of 470mm
- Use a brush 3 to put UHU POR in the beam opening of the fuselage
- Use the same brush to paint one side of the beam with UHU POR
- Wait for minimum 10 min to let the UHU POR get dry.
⇒ Next One with KLEIBERIT, difficult to bring the beam to the bottom